Tuesday 19 July 2016

Mitsubishi Regional Jet

Image @japantrends.com

The Mitsubishi Regional Jet (Japanese三菱リージョナルジェット), or MRJ for short, is a twin-engine regional jet aircraft seating 70–90 passengers manufactured by Mitsubishi Aircraft Corporation, a partnership between majority owner Mitsubishi Heavy Industries and Toyota Motor Corporation with design assistance from Toyota affiliate Fuji Heavy Industries, already a manufacturer of aircraft. It will be the first airliner designed and produced inJapan since the NAMC YS-11 of the 1960s, which was produced at a loss. Its first flight was in November 2015, with deliveries scheduled for 2018.
A cabin mockup and a scale model were presented at the 47th Paris Air Show in June 2007. The company has decided to formally offer the aircraft for sale to potential customers. Production was planned to begin in 2012. All Nippon Airways was the first customer, with an order for 15 MRJ 90s and an option for 10 more.
Image @publicbroadcasting.net
In March 2008, and again in October 2008, Sankei Shimbun and Fuji Sankei Business I reported that the government of Japan would buy ten MRJs to serve as short-haul and small-field VIP transports, supplementing the existing Japanese Air Force One Boeing 747 aircraft. The government was still considering this option as of July 2013, with MRJs possibly supplementing new Boeing 777 long-haul VIP transports, according to the Nihon Keizai Shimbun.
Image @flightglobal.com
The aircraft was initially expected to be the first regional jet aircraft to adopt carbon-fiber-reinforced polymer composite materials for its airframe on a significant scale. However, in a design turn-around in September 2009, Mitsubishi announced that it would use aluminium for its wingbox instead of composite material. Carbon composite parts will now make up only 10-15% of the aircraft, primarily around the tail section. The cabin height was increased by 3.8 cm (1 12 in) to 204 cm (80 12 in) and the fuselage height increased to 296 cm (116 12 in). This gave the MRJ a rounder cabin, which is wider and higher than competing aircraft manufactured by Bombardier and Embraer. 
MHI employs new production methods such as integral wing stringers, unusually tight tolerancesshot peening of curved surfaces, and A-Vartm. These methods are intended to increase quality and thus reduce expensive fault correction to keep price competitive. In 2008, Mitsubishi estimated that 300-400 MRJs would be necessary to recover the $1.9-billion programme cost.
The MRJ cabin is more spacious than similar regional jets.   (Photo: Jason Whitely / WFAA)
The MRJ lavatory features a full-length mirror.   (Photo: Jason Whitely / WFAA)
Image @news.sys-con.com
On 15 September 2010, the Mitsubishi Aircraft Corporation announced that it had entered the production drawing phase and was proceeding with the manufacturing process. Assembly of the first aircraft began in April 2011 with construction of the emergency escape for the cockpit.

A mock up of the MRJ flight deck – Image: Mitsubishi @airlinereporter.com

The first flight, scheduled after the design was finalized, was to take place in the second quarter of 2012, but was delayed to 2013, and then further delayed to spring 2014 due to delays in the procurement of engines. Likewise the first delivery was planned to take place in the first quarter of 2014, but was delayed to mid to late 2016.
At the Farnborough International Airshow July 2012, SkyWest agreed to buy 100 MRJ90s, to be delivered between 2017 and 2020. The deal is worth $4.2bn at list prices. During the 2013 Regional Airlines Association conference, held in MontrealCanada, Mitsubishi announced that ANI Group Holdings, which firmed a MoU for 5 MRJ aircraft in June 2011, cancelled the deal, without giving further details.
Image @ukintpress.com
In August 2013, Mitsubishi announced a third major delay to the program, and that the first flight would take place by summer 2015 while the first delivery would take place by summer 2017. Delays in the procurement of the Pratt & Whitney engines and other components were cited as the cause of this delay. In September 2013, after announcing the third delay to the MRJ program, Mitsubishi publicly displayed a prototype MRJ fuselage, including cockpit enclosure, and announced that it would hire foreign pilots and technicians to serve as consultants as the program progressed to safety testing and regulatory approvals.
Pictures of the first fully assembled MRJ90 were available on 26 June 2014, and an official rollout occurred on 18 October 2014.
The maiden flight of the MRJ90 took place on 11 November 2015.
On 24 December 2015, Mitsubishi announced a one-year delay for the first delivery of the MRJ, to mid-2018. The delay was attributed to insufficient wing strength and the redesign of the landing gear for better safety.
A 100-seat stretched MRJ100 was studied in March 2011. It was still evaluated in June 2015.
Image @takungpao.com

Specifications

Six versions are planned using two different fuselage lengths:
MRJ Specifications
MRJ70STDMRJ70ERMRJ70LRMRJ90STDMRJ90ERMRJ90LR
Passengers69 (9J + 60Y) to 8081 (9J + 72Y) to 92
Seat pitch74–79 cm (29–31 in) in Y, 91 cm (36 in) in J
Length33.4m / 109 ft 8in35.8m / 117 ft 5in
Wing span29.2m / 95 ft 10in
Tail height10.4m / 34 ft 2in
Max takeoff weight36,850 kg (81,240 lb)38,995 kg (85,969 lb)40,200 kg (88,626 lb)39,600 kg (87,303 lb)40,995 kg (90,378 lb)42,800 kg (94,358 lb)
Max landing weight36,200 kg (79,807 lb)38,000 kg (83,776 lb)
Max zero fuel weight34,000 kg (74,957 lb)36,150 kg (79,697 lb)
Operating empty weight-26,000 kg (57,320 lb)
Range (1-class)1,880 km (1,020 nmi)3,090 km (1,670 nmi)3,740 km (2,020 nmi)2,120 km (1,150 nmi)2,870 km (1,550 nmi)3,770 km (2,040 nmi)
Typical cruise speedMach 0.78 (447 knots (828 km/h))
Operating ceiling11,900 m (39,000 ft)
Takeoff field length (MTOW,SL,ISA)1,450 m (4,760 ft)1,620 m (5,320 ft)1,720 m (5,650 ft)1,490 m (4,890 ft)1,600 m (5,250 ft)1,740 m (5,710 ft)
Landing field length (MLW,Dry)1,430 m (4,700 ft)1,480 m (4,860 ft)
Cabin Height2.03 m / 6 ft 8in
Cabin Width2.76 m / 9 ft 1in
Powerplants (2x)Pratt & Whitney PW1215GPratt & Whitney PW1217G
Fan diameter56 in (140 cm)
Engine thrust (2x)69.3 kN (15,600 lbf)78.2 kN (17,600 lbf)

Current orders

Order dateAirline / PurchaserEISTypeRemarks
MRJ70MRJ90Options
27 March 2008Japan All Nippon Airways20181510to be operated by ANA Wings
2 October 2009United States Trans States Holdings20185050
11 July 2012United States SkyWest, Inc.2018100100
14 July 2014United States Eastern Air Lines20192020**Purchase rights (MoU)
14 July 2014Myanmar Air Mandalay201864
28 January 2015Japan Japan Airlines202132
16 February 2016United States AeroLease Aviation, LLC20181010
11 July 2016Sweden Rockton AB20201010
Total243204
In December of 2015, Mitsubishi announced that the first delivery of the Mitsubishi Regional Jet was delayed by one year to 2018.
Source @wikipedia.org

No comments:

Post a Comment