Tuesday 4 February 2020

Il-112V aircraft will have upgraded landing gear

Ilyushin

Il-112V aircraft will have upgraded landing gear | Recommender system Pulse Mail.ru

Translated by google


They will be handed over to aircraft manufacturers before the end of the year.

Until the end of 2020, the Aviaagregat plant in Samara, which is part of the Technodinamika holding of the Rostec state corporation, will hand over to the Voronezh Aircraft Engineering Society the first set of modified chassis for the promising military transport aircraft Il-112.

“In 2019, the designers of Aviaagregat finalized the design of the experimental landing gear and IL-112V cylinders, finalized the wiring of the front landing gear and taxiing IL-112V, as well as the tightness system in hydraulic units,” the press service of the Technodynamics Concern said ".

The company has successfully conducted a test cycle of all modified units. “We work in close contact with the Ministry of Defense, promptly responding to their requirements. In accordance with the decision to optimize the take-off mass of the aircraft, adjustments are made to the design documentation and technological processes, ”said Igor Nasenkov, general director of the holding.

Improved units have passed the factory test cycle.

“We work closely with the Ministry of Defense. In accordance with the decision to optimize the take-off mass of the aircraft, adjustments are made to the design documentation and processes quoted by TASS as the holding’s director general Igor Nasenkov.

Note, the Il-112V military transport aircraft is the first military transport aircraft that was developed in Russia from scratch in the post-Soviet period. At the same time, work on its creation has been ongoing since 2014.

The first test flight was March 30, 2019. Its duration was about 45 minutes. IL-112V will be able to carry up to 5 tons of cargo, and is intended for the transport of soldiers, military equipment and weapons.


No comments:

Post a Comment